Sewer System Management Plans

In May 2006 the State Water Resources Control Board (SWRCB) adopted the Waste Discharge Requirements (WDR), a regulatory program which will provide a consistent statewide approach to operation, maintenance, and management plans to reduce Sanitary Sewer Overflows (SSOs). These requirements will allow for the SWRCB to gather consistent causes and sources of SSOs by mandatory development and implementation of a Sanitary Sewer Maintenance Program (SSMP).
In order to ensure that the SSMP is being implemented by facilities the California Water Environment Association (CWEA), along with SWRCB have developed a schedule for program element completion. Completion dates are based on facility service size. Table 1, on the following pages, list the appropriate time schedule for completion.
Risk Management Professionals has a uniquely qualified and proficient team of engineers to conduct the tasks required for SSMP program compliance.  In order to comply with the 2007 deadline, we will complete the following tasks:

    Task 1: SSMP Compliance Assessment
    During a facility site visit, the facilities SSMP documentation will be reviewed to determine the level of compliance/completion. Also onsite interviews and records verification will be conducted.

    Task 2: SSMP Assessment Report
    A report, including recommendations, will be developed based on the findings from the SSMP Compliance Assessment.

    Task 3: SSMP Development Plan
    The development plan will identify how each SSMP program element will be addressed. The report will include making assignments, defining, scope, and assigning a schedule to each SSMP program element. Also included in Task 3, Section 1-Goals and Section 2– Organization for the SSMP Program will be developed.  A facility meeting will be conducted for review of the Assessment Report and assignment of deficiencies.

Table 1: Program Element Completion Dates

SSMP Element Completion Schedule

Facility Service Population:

> 100,000

10,000 to 100,000

2,500 to 10,000

< 2,500

Element

Completion Dates

SSMP Development Plan and Schedule

08/01/01

11/01/07

02/01/08

05/01/08

Section 1
Goals

11/01/07

05/01/08

Section 2
Organizations

Section 3
Legal Authority

11/01/08

05/01/09

11/01/09

02/01/10

Section 4
Operation and Maintenance Program

Section 6
Overflow Emergency Response Plan

Section 7
Fog Control Program

Section 5
Design and Provision Provisions

05/01/09

08/01/09

05/01/10

08/01/10

Section 8
System Evaluation and Capacity Assurance Plan

Section 9
Monitoring Measurements and Plan Modification

Section 10
SSMP Program Audits

Section 11
Communication Program

Final SSMP